Kahului Pier 1Scope:  New 210′ wide by 300′ long pier extension to support the new cruise ship and barges.  The harbor was dredged to minus 35 feet MSL and a steel sheet pile bulkhead installed to support structural fill required.  A new suspended concrete beam and slab deck supported on concrete piles (110 feet long) was provided to support a 1,000 psf uniform live load and Hyster Challenger 920 of 250 kips.